75,000m2 Clearing & Grubbing, 100,000m3 of Topsoil Stripping, 195,000m3 Common Excavation and Fill, 1500m Box Culvert Removal, Concrete, Asphalt and Debris Removal , Crushing and Material Export 2300m Storm, 1600m of Watermain, 1300m SanitaryMay 8, 2024
3 blocks of new watermain & replacement, service connections and surface works.April 18, 2024
1600m3 of topsoil stripping, 14,000m3 cut to fill, 34,000m3 stockpile removal to borrow pit.March 25, 2024
89,000M3 Stripping to Stockpile, 271,000M3 Cut to Fill, 79,000 M3 Borrow Pit to Stockpile, Pond Construction –19,900m2 CCL pond, 58,000M3 of Rock ExcavationOctober 16, 2023
Remove existing 675 CON storm line, excavate 20,000 m3 storm pond, install inlet/outfall control structure, construct access road.September 19, 2023
- Site stripping & Grading - Pump station structural Excavation & Backfill - UV2 Building structural Excavation - 125m of 600mm HDPE Conveyance Forcemain - 38m 750mm Trenchless crossing - 127m 6” Potable Waterline - 43m 900mm Concrete Sanitary Connection w/1800mm Manhole with Epoxy lining - Sewage holding tank w/ inlet pipe 17mSeptember 14, 2023
Offsites Servicing for Commercial Development. - 205m Sanitary 15" - 545m Storm 15" - 1950mm - 440m Water 12" With potential extension to Onsites work in 2024July 4, 2023
Landfill Cell Construction including 40,000M3 topsoil stripping, 30,000M3 of Subsoil Excavation 320,000M3 Common Excavation, 130,000M3 Clay Liner, 150,000M2 of GCL installation, 45,000M3 Drainage Layer Placement. 2,100LM of HDPE, 450LM 1050mm PVC, 110LM CSP Culvert Installation and much more.June 27, 2023
Riprap river berm within Bow RiverJune 27, 2023
Hourly work for lagoon berm repairsMay 9, 2023
Site Servicing Including: 650m Sanitary Sewer, 1900m Storm Sewer, 1600m Water MainMay 9, 2023
78,500M3 Stripping to Stockpile, 200,000M3 Cut to Fill, Range Road 292 Construction, 179,000m3 common export, 61,400 M3 Topsoil Export, Pond Construction – 41,000M2 of GCL